
Eclipse AirHeat v2.00, Installation Guide No. 135, 7/99
20
Yearly Checklist 1. Leak test the safety shut-off valves for tightness of
closure.
2. Test the pressure switch settings by checking the switch
movements against pressure settings and comparing these
with the actual impulse pressure.
3. Visually check igniter cable and connectors.
4. Be sure the following components are not damaged or
distorted:
• the burner bodies and air wings.
• the igniter.
• the flame sensors.
Comentarios a estos manuales